A building material is not considered eco-friendly solely because of its composition. Its sustainability is measured across its entire life cycle: extraction, processing, transportation, installation, use, and end of life. Choosing the right materials for an eco-construction project requires a thorough understanding of this scope of analysis, which the RE2020 makes mandatory for all new buildings.
Life cycle assessment: the technical filter before choosing materials
The RE2020 requires a life cycle assessment (LCA) for every new-build project. This calculation takes into account the material’s embodied energy, its carbon emissions during manufacturing, its performance during use, and its potential for recycling or reuse. A bio-based material whose transportation generates high carbon emissions may prove less effective than a geo-based material sourced locally.
The RE2020 carbon thresholds depend on the date the planning permission application is submitted. The 2025 milestone is already in effect, and requirements will become stricter in 2028 and then in 2031. Material choices must therefore be verified in the building’s environmental assessment, not based on a simple marketing label.
Each material has an environmental and health declaration sheet (FDES), available in the INIES database. This sheet details environmental impacts across the entire life cycle. Before approving a material for a project, you can contact France Écoconstruction for help interpreting this technical data.
Bio-based and geo-based materials: two families with distinct characteristics

Bio-based materials come from biomass: wood, hemp, straw, cellulose wadding, sheep’s wool, and cork. Their main advantage is their ability to store biogenic carbon throughout the building’s service life. Wood, for example, sequesters the CO₂ absorbed as the tree grows.
Geo-based materials, such as raw earth or dry stone, rely on local mineral resources. Their manufacturing carbon footprint is often very low because they require little or no firing. Raw earth provides natural hygrothermal regulation, an advantage that is rarely highlighted compared with wood or hemp.
The “bâtiment biosourcé” label, revised in 2024, now combines biogenic carbon storage with the diversity of functions performed by the materials. It remains voluntary, but provides a more reliable benchmark than a simple marketing claim.
Quick comparison of common eco-construction materials
| Material | Main use | Technical advantage | Point to consider |
|---|---|---|---|
| Wood (timber frame, CLT) | Structure, roof framing | Carbon storage, lightweight | Fungicide treatment may be needed, depending on the wood species |
| Hemp (hempcrete) | Insulation, infill | Moisture regulation | Long drying time |
| Straw (bales) | Wall insulation | High thermal performance | Specialist installation methods and local expertise required |
| Cellulose wadding | Loft and wall insulation | Uses recycled paper | Susceptible to moisture if poorly installed |
| Raw earth | Walls, renders | Thermal mass, low embodied energy | Installation standards are not yet widely established |
| Cork | Thermal and acoustic insulation | Rot-resistant, durable | Often imported |
Thermal insulation in eco-construction: balancing performance and local availability
Insulation is where choosing an eco-friendly material has the greatest impact on everyday comfort and energy bills. The share of bio-based insulation on the market is growing, but it remains a minority. Supply, installation expertise, and solutions suited to different site conditions vary from one region to another.
When locally available, straw bales offer some of the highest thermal resistance at a very low material cost. Hempcrete combines insulation with a structural infill function, but requires a long drying time that extends the construction schedule. Blown or injected cellulose wadding is well suited to lofts and renovation projects.

Three criteria can help you choose insulation for an eco-friendly home:
- The material’s thermal conductivity (lambda), which determines the thickness required to achieve the thermal resistance targeted by the project
- Thermal lag, which measures how long heat takes to pass through a wall—an important factor for summer comfort without air conditioning
- The availability of professionals trained to install the material in the project area, since poor installation can negate its theoretical performance
Material reuse: check traceability before reducing your footprint
Reusing construction materials is becoming more prominent in sustainable eco-construction projects. Reusing timber beams, bricks, or windows and doors helps reduce the consumption of new resources and the associated embodied energy.
The challenge lies in ensuring the technical reliability and insurability of reused materials. For a project, you need to check the traceability of salvaged materials, assess their remaining performance, and ensure they are suitable for their intended use.
Reuse does not replace the choice of new bio-based or geo-based materials throughout a project. It complements them in specific areas where traceability and compliance can be guaranteed.
Building carbon footprint: materials are only part of the picture
An eco-friendly material that is poorly installed or unsuitable for the local climate can worsen a building’s overall footprint. Material choices must be validated in the context of the project, not in isolation. The building’s orientation, the compactness of its architectural form, and the management of thermal bridges matter just as much as the type of insulation or structural material.
The RE2020 carbon thresholds encourage designers to take a whole-system approach. A timber-frame wall insulated with straw will not offset a conventional concrete flat roof if the overall LCA exceeds the applicable regulatory threshold.
Choosing materials for eco-construction involves balancing three factors at once: measurable technical performance, compliance with regulatory carbon requirements, and the realities of local supply. Ignoring any one of these factors can lead to additional costs or a gap between the project’s stated environmental ambitions and the building’s actual performance.



